An example of kitchen drains passing through a room to get to
the shaft, using the necessary inclination. These pipes will be
then tested before the tiles are laid.

<<
back to services |
Plumbing of a bathroom using p.v.c. pipes passing through the walls, these also will be pressure tested for a couple of days before wall tiles are laid. This is done to minimise the chances of any problems once the tiles are laid.

<<
back to services
|
Again we have water pipes of a
shower passing through the wall,
pressure test is always done.

<<
back to services
|
Preparation of drains and water pipes of a corner bath before tiles are laid, again all drain and water pipes are tested prior to tile laying.

<<
back to services
|
Water tank supplied and installed on the washroom of a flat, having all down drops feeding the flat connected also the main riser from the meter to feed the tank.

<<