An example of kitchen drains passing through a room to get to
the shaft, using the necessary inclination.  These pipes will be
then tested before the tiles are laid.



<< back to services

Plumbing of a bathroom using p.v.c. pipes passing through the walls, these also will be pressure tested for a couple of days before wall tiles are laid.  This is done to minimise the chances of any problems once the tiles are laid.



<< back to services

Again we have water pipes of a
shower passing through the wall,
pressure test is always done.



<< back to services

 

Preparation of drains and water pipes of a corner bath before tiles are laid, again all drain and water pipes are tested prior to tile laying.



<< back to services

Water tank supplied and installed on the washroom of a flat, having all down drops feeding the flat connected also the main riser from the meter to feed the tank.



<< back to services

 
 


.
About Us | Services | FAQ's | Projects | Testimonials | Affiliates | Jobs & Careers | Contact us | Request a Quotation........................ 23 Print Page 23 Send Page


© 2006. The material on this site may not be reproduced, distributed, transmitted or otherwise used, except with the prior written permission of Sphinx Creations Ltd.
Website created by switchpg.com